Non-Compliance detail


  
Summary
 
Licence number: 766
Annual Return Start: 01 Jan 2009
Annual Return End: 31 Dec 2009
Date Received: 24 Feb 2010
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L3 Wallerawang Discharge Point 1 (Unit 7 Cooling Tower Blowdown) to Coxs River. Minor exceeded of upper pH limit on 11 May 2009. EPA to monitor future compliance with this condition 1
M2 Monitoring of discharge at LDP4. Failed to analyse one sample for Aluminium and Nickel as required by licence, due to insufficient sample collected on 1 Aug 2009 to perform all required analysis. Appropriate Action taken by licensee 1